As a part of the Consistent Provision of Electric Power for the City of Ashkhabad, the Parahat-7 Switchyard with 8 Feeders for 110 kW, and Parahat-7 Double Circuit Overhead Line with 110 kW were powered and successfully put into operation on February 2, 2015. 2 pieces of 40/40/40 MWA power transformer met the energy need of Parahat-7 housing estate the construction of which is currently in progress.