  • Project Title : Al-Khairat Simple Cycle Power Plant ​
  • Capacity : 1.250 MW
  • Equipment : 10 x GE-PG9161-E (Frame 9E)
  • Voltage Level : 132 kV & 400 kV
  • Commencement Date : April 2011
  • Date of Delivery : November 2013 ​
  • Employer : Ministry of Energy, Iraq
  • Scope : Lump Sum Turnkey EPC Prime Contractor
  • 13.01.2011

Description of Project

    Al-Khairat Power Plant Project is reinforced with installed capacity of 1.250 MW as the largest Simple Cycle Power Plant Project of Çalık Enerji and Iraq. It has the largest GIS of the Middle East (400 kV and 132 kV). It will run on three types of fuel including natural gas, LDO and crude oil. Around 10 million man/hour was spent over the course of the project as 2.100 people were employed during the peak period. The project made use of 200.000 m³ of concrete, 12.000 ton of reinforcement, 11.000 ton of steel, 1.100 km long cable, 80 km long PVC pipe, 90 km long steel pipe and 350.000 m³ of stabilized filling.