EPC Power Systems

Expansion Of Tedzani Electricity Hydropower Station - Tedzani-4


About Project

  • Project Title : Expansion Of Tedzani Electricity Hydropower Station - Tedzani-4
  • HPP Type : Run Off River
  • Location : Malawi
  • Status : Under Construction
  • River : Shire River
  • Installed Capacity : 19,3 MW
  • Annual Energy Generation : 151,4 GWh
  • Average Annual Flow : 348 m³/s
  • Design Flow : 58,5 m³/s
  • Net Head : 37,0 m
  • Voltage Of Transmission Line : 66 kV
  • Commercial Enterprice ​: December 2020
  • Turbines : Vertical Francis (1 Units)
  • ​Content of Scope : Our company's scope includes the construction works of all facilities that will supply the water from the existing dam to the powerhouse and ensure energy generation (water intake facility, water canal, overflow spillway, scouring sluices, stilling pool, powerhouse, access road etc.) and equipment procurement (penstock, covers, turbine, generator, switchgear, transmission line etc.).
  • 15.07.2017

Description of Project

The Tedzani 4 HEPP Project is aimed at increasing the total installed capacity of Tedzani 1, 2 and 3 Hydroelectric Power Plants, located at the distance of 70 km to Blantyre, Malawi's second largest city, by 18 MW. Together with the construction of all water works and power plant buildings under the Project, Çalık Enerji has also undertaken the supply and installation of the hydro-mechanical, electrical and electromechanical equipment on a turn-key (EPC) basis.