Power Generation

Çankırı-Orta Thermal Power Plant and Mine Site Project


About Project

  • Project Title : Çankırı-Orta Thermal Power Plant and Mine ​Site Project​
  • Location : Çankırı-Orta​
  • Gross Capacity : 150 MW
  • Fuel Type : Lignite from The Captive Mine
  • Removable Mine Reserves : 64,4 m tons
  • Thermal Efficiency : 37,45% LHV
  • Annual Energy Generation : 900 GWh
  • Power Offtake : Primarily Merchant
  • Construction Start Date : 2018
  • 01.01.2015

Description of Project

    It is the first thermal power plant project of Çalık Enerji. 150 MW Thermal Power Plant and Mining Site Project,

    1 Foster Wheeler CFB (Fluidized-Bed) Boiler,

    1 Steam Turbine,

    ACC (Air-Cooled Condenser),

    WTP (Water Treatment Plant),

    ESP (Electrostatic Filter),

    High-Voltage Switchyard (HV),

    Ash Storage Yard,

    Transport (Lignite) Units,

    Open Pit Mining Operations.