Power Generation

Adacami Hydroelectric Power Plant


About Project

  • Project Title : Adacami Hydroelectric Power Plant
  • HPP Type : Run Off River
  • Location : Adacami / Rize​ - TURKEY
  • Status : Under Operation
  • River : Potamya and Salarha
  • Drainage Area : 223 km²
  • Installed Capacity : 30 MW
  • Annual Energy Generation : 108,5 GWh
  • Average Annual Flow : 10,08 m³/s
  • Design Flow : 26 m³/s
  • Net Head : 125 m
  • Voltage Level : 31,5 kV
  • Length Of Transmission Line : 3 km
  • Capacity Factor : 40%
  • Term of License : 43 Years, 7 Months
  • Commercial Enterprice ​: August 2013
  • Turbines : Horizontal Axis Francis (2 Units)
  • Content of Scope : 4 Weir Structures - 11,5 km Long  Transmission Tunnel - Toe Powerhouse Building
  • 01.08.2011

Description of Project

Adacami HPP Project, located in Güneysu-Rize, is the first power generation plant of Çalık Enerji. The Hydropower Plant has 30 MW installed capacity which generates 108,5 GWh energy in a year. It is capable of meeting energy requirements of almost 40 thousand people. 

The project is completed without any occupational accident. 

It has 4 weir structures, 11,,6 km of water transmission tunnel, 530 m horizontal penstock  and 110 m vertical tunnel shaft of water intake structure. ​